How MCP Marine Solves Problems Onboard and in Dock: Technical assistance, maintenance, repair, and recommissioning of cathodic protection, antifouling systems, and desalination units on ships and offshore installations.

Each case below is taken from a 2026 technical report: The problem we encountered, what we did, and the measured result. For confidentiality reasons, we do not name clients or vessels.

Go to: Technical Assistance and Repairs Onboard · Dry-Docking and Recommissioning · Desalination System Maintenance

Technical Assistance and Onboard Repairs

ICCP Shut Down: Cause Identified and System Restored

Offshore support vessel, Guanabara Bay, August 2026.

Situation: The 100 A ICCP control panel was inoperative.

What we did: We found the rectifier bridge was faulty and replaced it. We tested it in manual mode at 100% and in automatic mode, checked the reference cells, and measured the hull with an independent portable cell. We also inspected the MGPS.

Result: ICCP and MGPS fully operational, hull within the protection range, and panel operating in automatic mode without alarms.

Faulty rectifier bridge found on the ICCP panel
Previously: Faulty rectifier bridge found on the ICCP panel
ICCP panel with the new rectifier bridge installed
After: ICCP panel with the new rectifier bridge installed

Fault in the bow ICCP: Hull protected until the part arrives

Coastal container ship, Port of Rio de Janeiro, August 2026.

Situation: The panels showed the hull outside the protective zone.

What we did: The bow power module was only delivering 50 A, half its capacity. We reconfigured the stern panel as a contingency measure and verified the results with a portable meter.

Result: Readings returned to the control range during the same visit, with a recommendation to replace the module and a reminder to bring the vehicle in for its next tune-up.

Power module replaced and ICCP at 100%

Offshore support vessel, shipyard in the state of Rio, June 2026.

Situation: The ICCP panel required repair of the power module.

What we did: We replaced the module and ran the complete protocol: power supply, grounding, manual and automatic modes, thermal imaging of the panel, and hull measurement using a portable sensor.

Result: 120 A at 100%, balanced current between the two anodes, no abnormal heating, and the hull within the protection range.

Stern panel turned off for no apparent reason

Coastal container ship, Santos, May 2026.

Situation: The stern ICCP was de-energized and the hull was underprotected.

What we did: We found a power cable that had overheated due to a loose connection and a broken thyristor trigger wire. We reworked the connections, replaced the terminals and insulation, and tested the unit in both manual and automatic modes.

Result: Stern anodes replaced, with 158 A at 100% and readings back within the protection range. Replacement of the bow anodes was scheduled for the next dry-docking.

Thyristor terminal with signs of overheating and oxidation
Before: Thyristor terminal showing signs of overheating and oxidation
Clean connection and insulated power cable
Next: Clean connection and insulated power cable

Docking and Recommissioning

Recommissioning after dry docking

Coastal container ship, Santos, September 2026.

Situation: The ICCP and MGPS on the K.C. LTD needed to be recommissioned with the ship back in the water, with new iron anodes installed in the MGPS.

What we did: Complete ICCP protocol (4 anodes, reference cells, alarms) and MGPS commissioning.

Result: Everything approved with no outstanding issues. ICCP at 234 A during manual testing, balanced current among the four anodes, and hull within the protection range.

Water in the cofferdams and a damaged shield on the water jet

Offshore support vessel, docked in the state of Rio, 2026.

Situation: ICCP anode cables damaged by water in the cofferdams, dielectric shield partially stripped away by hydroblasting, and an MGPS copper anode at the end of its service life.

What we did: We dried and reconnected the cables, installed new gaskets, repaired the dielectric shield, treated and painted the cofferdam, and replaced the copper anode.

Result: The hull is within the safety margin at all 8 measured points; the ICCP is delivering 84 A at 100%, and the MGPS has been adjusted. Systems approved with no outstanding issues.

Dielectric shield removed by hydroblasting
Before: Dielectric shield removed by hydroblasting
Recomposed dielectric shield around the anode
Next: Reconstructed dielectric shield around the anode
Cofferdam showing signs of corrosion prior to treatment
Before: Corroded cofferdam prior to treatment
Cofferdam treated and painted
Next: Cofferdam treated and painted

Docking: Replace only what was necessary

Offshore vessel, shipyard in the state of Rio, June 2026.

Status: ICCP and MGPS inspection in dry dock.

What we did: We inspected all the MGPS anodes and replaced only the 4 that were at the end of their service life; the rest will last until the next dry docking. We adjusted the current for a 5-year service life and commissioned the system after refloating.

Result: ICCP and MGPS operational, hull within specifications, and spare parts plan in place for the next dry docking.

MGPS copper anode corroded in the seawater chamber
Before: MGPS copper anode corroded in the seawater chamber
New copper anode installed in the seawater tank
Next: New copper anode installed in the seawater tank

Complete docking: MGPS and ICCP anodes replaced

Offshore support vessel, shipyard in the state of Rio, May 2026.

What we did: We replaced the 22 copper anodes of the MGPS, the 2 anodes and 2 reference cells of the ICCP, restored the dielectric shield, and replaced cable glands and junction boxes.

Result: Both systems are operational, the hull is within the protection range, and the ICCP is delivering 74 A during a manual test.

New MGPS copper anodes in the seawater tank
Next: New MGPS copper anodes in the seawater tank
New ICCP anode with a reconstituted dielectric shield
Next: New ICCP anode with a restored dielectric shield

Docking inspection without unnecessary changes

Offshore support vessel, shipyard in the state of Rio, April 2026.

Status: Preventive inspection with the hull freshly painted.

What we did: We opened the four ICCP cofferdams, checked the torque, replaced dried-out gaskets, and performed a thermal imaging scan of the panel. The anodes and cells were in good condition and did not need to be replaced. At the MGPS, we replaced the depleted copper and iron anodes.

Result: The ICCP is in good condition, operating at 120 A at 100% capacity, and the MGPS has new anodes that have been properly installed in the operational tanks.

Desalination Plant Maintenance

Desalination plant without salinity control

Vessel, shipyard in the state of Rio, May 2026.

Situation: Faulty salinity control board on the reverse osmosis desalination unit (20 m³/day).

What we did: We replaced the control board, inspected the connections, tested the alarms and solenoid valves, and adjusted the automatic discharge setting for water salinity above 850 µS. We briefed the crew.

Result: Unit cleared for operation, with a recommendation to recalibrate the high-pressure pump pressure switches.

Do you need technical assistance, maintenance, or support with docking?

Contact our technical team: WhatsApp +55 21 99512-0824 · +55 21 2088-8137 · info@mcpmarine.com.br

Talk to a technician

Related links: ICCP Cathodic Protection · MGPS/ICAF Anti-Fouling Systems · Dockyard Services · Reverse Osmosis Desalination Systems

RELATED ARTICLES